items tracked: your 28 + 10, plus the points we added so nothing lives only in Slack.
We will repaint every area you mentioned, including the bedroom and bathroom area, and go over each detail until the finish is right. One single pass, after the tiling, grouting and fittings, so nothing gets damaged again. Laundry doors #5 and the brush holder #20 follow in the same pass.
Microcement marks with cooking. We suggest a beige tile; we bring a sample and the price.
Planned in 9001 like the façade. Dark blue as you suggest, or brown 8019, close to the window frames.
Your photo shows us exactly where. We will check the girls’ balcony door at the same time.
They fit in the room behind the laundry. Access through the iron laundry door; a new door in the window is blocked by the foundations.
Once you choose the spot by the pool, we price water supply and drainage.
Approved, thank you. The 50 % proforma lets the specialist order the products and treat before 20 December. The space stays empty for 24 h.
The feeling we want for the guest houseThe roofer inspects, cleans and photographs it, and applies a temporary fix so heavy rain stays out. The full solution is designed into the renovation.
Bedroom, sofa, chair and living-room table, installed by our team once the roof check and woodworm treatment are done. The kids’ partners will be comfortable.
We clear the furniture again and the builder starts. The end date is a target until the roof diagnosis is in, and the builder confirms it in writing.
As you asked: finished before spring, so you can invite friends to join you.
Debris on the tiles blocked the water; heavier rain flushed it away.
Plausible: pines above the kitchen.
Confirmed on the roof, with photos.
Part of the July work was arranged by us. Scope and amount were not agreed with you upfront.
The plants in the outdoor pots and the border by the air-con units were part of the plan.
The polish-up on 10 July, the day you arrived with your father, was presented as a gesture.
Your July list.
ILI invoice: router and fibre.
Removed by the builder during the works.
Pool gutter overflow; gutter wall raised.
Every open point is closed to this level.














Agreements appear here as we go.